Paving work coming up in Tampa Bay
794 projects in Tampa Bay fit asphalt plants and paving and striping contractors in the last 30 days. Each has a building permit, a construction start, a site plan or a construction loan on the public record, at $500K and up, in the phases where paving gets bought.
Projects that fit, from the last 30 days
A few of the 794, biggest first. Each opens its project file. Pro names the people on each one.
- The Collector's Vault Building TwoNew industrial buildingPermit · Approved
- 14265 Pine Straw CtNew housePermit · Approved
- 2609 N Dundee StNew housePermit · Approved
- 16333 Victoria Lakes BlvdNew housePermit · Approved
- 25 S Treasure DrNew housePermit · Approved
- 10741 Maple Meadows LnNew housePermit · Approved
- 1914 W Cass StSite planProposed
- 4311 W South AveSite planProposed
When paving gets bought
Paving comes near the end. Parking lots and drives go in once the building is up.
On 20 Miami jobs we measured, the paving permit landed a median 246 days after the first building permit, and three in four had it by day 387.
Site plans, new building permits and construction starts for retail, warehouses and apartments with parking.
The busiest GCs in Tampa Bay
Named on the most building permits over the last 90 days. They buy the paving, or hire the sub who does.
- 1Lennar Homes LLC56 permits
- 2Kimmins Contracting Corporation26 permits
- 3D R Horton INC22 permits
- 4S&H West Coast of Florida, Inc17 permits
- 5Dbk INC15 permits
In ChatGPT or Claude
With Pro, ask your AI assistant for paving jobs in Tampa Bay and it reads Groundbreak for you, names included. It works in Claude, ChatGPT, Cursor and any app that takes an MCP server.
Set it up in a minute ↗Questions
- How do asphalt plants and paving and striping contractors find new projects in Tampa Bay?
- Watch the public record, not the bid boards. Site plans, new building permits and construction starts for retail, warehouses and apartments with parking. 794 projects in Tampa Bay fit asphalt plants and paving and striping contractors in the last 30 days. Each has a building permit, a construction start, a site plan or a construction loan on the public record, at $500K and up, in the phases where paving gets bought. Radar sends the next one the day it files.
- When does a GC buy paving on a job?
- Paving comes near the end. Parking lots and drives go in once the building is up. On 20 Miami jobs we measured, the paving permit landed a median 246 days after the first building permit, and three in four had it by day 387.
- Which general contractors are building the most in Tampa Bay?
- Over the last 90 days, Lennar Homes LLC (56 permits), Kimmins Contracting Corporation (26) and D R Horton INC (22) are named on the most Tampa Bay building permits. The full list is in the most active contractors report.
- Where does this count come from?
- Groundbreak reads permits, deeds, mortgages, notices of commencement and FAA height filings in Tampa Bay every day and groups them into projects. This page counts the projects at the stages a sub watches, the same count sign-up shows for the same picks. It was computed Nov 12, 2026, 3:13 AM Eastern and updates daily.
- What does Groundbreak cost?
- Creating an account is free: tell Radar what you work on and it shows your matches. The names, phones and figures on every record are Pro. There is no free trial. Pro is $27 a month, every market. Cancel anytime.
- Can I ask ChatGPT or Claude for this?
- Yes, with Pro. Groundbreak runs an MCP server, so Claude, ChatGPT, Cursor and other AI assistants can search Tampa Bay's permits, projects and companies and say who is on them. Setup takes a minute: https://docs.groundbreak.city/mcp.