FAA Form 7460-1 (notice of proposed construction)
Form 7460-1 is the notice a builder files with the Federal Aviation Administration before putting up anything taller than 200 feet, or anything near an airport that reaches into its airspace, so the FAA can study it as a possible hazard to flights. Towers file their height, and the cranes that build them file their own, at least 45 days before construction. The FAA publishes every case with its point, height and dates, and names the sponsor once it decides.
Why it matters for a lead
A tower files its height during design, before construction starts. A crane filing says where a building is about to go vertical, how tall the crane stands and how many months it stays: the timing a supplier or a sub needs. In Miami nearly every tower files, since the airports' airspace covers the metro.
Where Groundbreak gets it
The FAA Obstruction Evaluation archive, read daily for every market: new buildings and cranes that stay six months or more.
Related terms
Guides
Questions
- What is a faa form 7460-1?
- Form 7460-1 is the notice a builder files with the Federal Aviation Administration before putting up anything taller than 200 feet, or anything near an airport that reaches into its airspace, so the FAA can study it as a possible hazard to flights. Towers file their height, and the cranes that build them file their own, at least 45 days before construction. The FAA publishes every case with its point, height and dates, and names the sponsor once it decides.
- Why does a faa form 7460-1 matter for construction leads?
- A tower files its height during design, before construction starts. A crane filing says where a building is about to go vertical, how tall the crane stands and how many months it stays: the timing a supplier or a sub needs. In Miami nearly every tower files, since the airports' airspace covers the metro.
- Which Groundbreak markets publish the faa form 7460-1?
- Austin, Atlanta, Miami, Nashville, Tampa Bay, Charlotte, Dallas-Fort Worth, Toronto, Pittsburgh. The FAA Obstruction Evaluation archive, read daily for every market: new buildings and cranes that stay six months or more.