Trade sub-permit

A trade sub-permit is a separate permit pulled by the subcontractor for one trade on a job: electrical, plumbing, mechanical, roofing, shoring or concrete. It is issued under the master building permit and names the sub, not the general contractor.

Why it matters for a lead

The sub-permit is a timing signal. The shoring or concrete permit means the structure is about to start; the electrical and mechanical permits mean the rough-in is weeks away. Each one names a firm that was just hired.

Where Groundbreak gets it

Miami-Dade trade permits; Metro Nashville electrical, plumbing and mechanical permits; Mecklenburg commercial trade permits; City of Pittsburgh electrical, mechanical and fire permits. Each matched to the tracked job.

Related terms

Guides

Questions

What is a trade sub-permit?
A trade sub-permit is a separate permit pulled by the subcontractor for one trade on a job: electrical, plumbing, mechanical, roofing, shoring or concrete. It is issued under the master building permit and names the sub, not the general contractor.
Why does a trade sub-permit matter for construction leads?
The sub-permit is a timing signal. The shoring or concrete permit means the structure is about to start; the electrical and mechanical permits mean the rough-in is weeks away. Each one names a firm that was just hired.
Which Groundbreak markets publish the trade sub-permit?
Miami, Nashville, Charlotte, Pittsburgh. Miami-Dade trade permits; Metro Nashville electrical, plumbing and mechanical permits; Mecklenburg commercial trade permits; City of Pittsburgh electrical, mechanical and fire permits. Each matched to the tracked job.

See every filing as it lands.

The account is free and shows your matches. Pro is $27 a month, every market, cancel anytime.