Miami, FLFRI, OCT 30Filings 7d1,662Permits 7d461Deeds & loans 7d366Starts 7d305Updates 7d644Building1,916Phones on file27,924
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour.