Drywall and framing work coming up in New York
318 projects in New York fit drywall and metal stud suppliers and framing subs in the last 30 days. Each has a building permit, a construction start, a sub hired on a trade permit or a site plan on the public record, at $1M and up, houses left out, in the phases where drywall and framing gets bought.
Projects that fit, from the last 30 days
A few of the 318, biggest first. Each opens its project file. Pro names the people on each one.
- SBH Health SystemNew healthcare buildingApproved
- Asphalt pavement resurfacing various locationsNew retail buildingPermit · Proposed
- Sign structure replacementNew retail buildingPermit · Proposed
- NYU Langone HospitalsRenovation of a healthcare buildingProposed
- Regal HealthHealthcare buildingProposed
- Planned Parenthood Hudson Peconic - Mt. VernonRenovation of a healthcare buildingProposed
- Southampton Admin Bldg UpgradesRenovation of a school or civic buildingStarted · Under construction
- Carroll AveSiteStarted · Proposed
When drywall and framing gets bought
Framing and drywall start once the building is dried in. On a mid-rise that is months after the start.
On 11 Miami jobs we measured, the drywall and framing permit landed a median 496 days after the first building permit, and three in four had it by day 613.
Construction starts and permits for apartments, hotels, offices and fit-outs.
In ChatGPT or Claude
With Pro, ask your AI assistant for drywall and framing jobs in New York and it reads Groundbreak for you, names included. It works in Claude, ChatGPT, Cursor and any app that takes an MCP server.
Set it up in a minute ↗Questions
- How do drywall and metal stud suppliers and framing subs find new projects in New York?
- Watch the public record, not the bid boards. Construction starts and permits for apartments, hotels, offices and fit-outs. 318 projects in New York fit drywall and metal stud suppliers and framing subs in the last 30 days. Each has a building permit, a construction start, a sub hired on a trade permit or a site plan on the public record, at $1M and up, houses left out, in the phases where drywall and framing gets bought. Radar sends the next one the day it files.
- When does a GC buy drywall and framing on a job?
- Framing and drywall start once the building is dried in. On a mid-rise that is months after the start. On 11 Miami jobs we measured, the drywall and framing permit landed a median 496 days after the first building permit, and three in four had it by day 613.
- How do I find out which sub won the job in New York?
- New York publishes trade permits, and each one names the sub who pulled it. Radar shows them the day they file, so you can call the sub who now buys the drywall and framing.
- Where does this count come from?
- Groundbreak reads building permits naming owner, architect and GC, subs on trade permits, deeds with the price, loans with the lender, rezonings and land use applications, landmarks and BSA approvals, affordable housing starts, city construction awards, public works payrolls and FAA height filings in New York every day and groups them into projects. This page counts the projects at the stages a supplier watches, the same count sign-up shows for the same picks. It was computed Nov 11, 2026, 2:44 AM Eastern and updates daily.
- What does Groundbreak cost?
- Creating an account is free: tell Radar what you work on and it shows your matches. The names, phones and figures on every record are Pro. There is no free trial. Pro is $27 a month, every market. Cancel anytime.
- Can I ask ChatGPT or Claude for this?
- Yes, with Pro. Groundbreak runs an MCP server, so Claude, ChatGPT, Cursor and other AI assistants can search New York's permits, projects and companies and say who is on them. Setup takes a minute: https://docs.groundbreak.city/mcp.