Largest building permits filed in Toronto this month
22 of the largest building permits issued in Toronto so far this month add up to $199M in declared valuation. The biggest, $100M, is 65 Raglan Ave at 65 Raglan Ave, Toronto, ON.
| # | Project | Address | Work | Valuation | Issued |
|---|---|---|---|---|---|
| 1 | 65 Raglan Ave | 65 Raglan Ave, Toronto, ON | New Building / Apartment Building: To construct a 28 storey residential building for 320 units with 3 level underground parking garage | $100M | Nov 3, 2026 |
| 2 | 71 Front St W | 71 Front St W, Toronto, ON | Building Additions/Alterations / Other(BA) / Transit Station,Subway, Bus Terminal: The 1970s Trainshed Removal project consists of the dismantling of the 1970s Trainshed structure. | $50.0M | Nov 3, 2026 |
| 3 | 99 Cartwright Ave | 99 Cartwright Ave, Toronto, ON | Building Additions/Alterations / Addition(s) / Elementary School: NEW 2-STOREY CLASSROOM ADDITION AND MINOR RENOVATION TO EXISTING AT CONNECTION, SITE WORKS TO FACILITATE NEW GREEN SPACE (NORTH SIDE) AND PARKING OFF BENTWORTH AVE. | $18.0M | Nov 5, 2026 |
| 4 | 1577 Lawrence Ave W | 1577 Lawrence Ave W, Toronto, ON | Building Additions/Alterations / Garage Repair/Reconstruction / Apartment Building: Rehabilitation of the underground parking garage, podium deck and localized repairs to the exterior walls at 1577 Lawrence Avenue West (asphalt, concrete, masonry, expansion joints, landscaping, electric snow melting cable reconstruction/repair) | $5.6M | Nov 4, 2026 |
| 5 | 180 Simcoe St | 180 Simcoe St, Toronto, ON | Building Additions/Alterations / Interior Alterations / Office: Proposal interior alteration to existing Group D commercial office building. Basement, Ground, 6th & 9th Floors. | $3.0M | Nov 2, 2026 |
| 6 | 3400 Weston Rd | 3400 Weston Rd, Toronto, ON | Mechanical(MS) / Other(MS) / Apartment Building: Proposal for the drilling of geothermal low-carbon energy system consisting of 76 boreholes. Planned drilling start date is November 2, 2026. | $2.5M | Nov 4, 2026 |
| 7 | 212 Brookfield Ave | 212 Brookfield Ave, Burlington, ON | New / Single Detached Dwelling | $2.1M | Nov 3, 2026 |
| 8 | 30 The Queensway | 30 The Queensway, Toronto, ON | Building Additions/Alterations / Interior Alterations / Hospital: Proposed interior alterations within multiple areas of the existing hospital. The scope of work includes minor architectural, mechanical, and electrical modifications to accommodate revised layouts. Work includes new interior partitions, finishes, doors, light fixtures, and associated HVAC systems. There is no change to building use, occupancy classification, and gross floor area. | $2.1M | Nov 2, 2026 |
| 9 | 2460 Winston Churchill Boulevard | 2460 Winston Churchill Boulevard, Oakville, ON | New Construction / Restaurants: Proposed one storey building for "Chik Fil A" restaurant w/ drive thru canopy. | $2.0M | Nov 4, 2026 |
| 10 | 95 St Clair Ave W | 95 St Clair Ave W, Toronto, ON | Building Additions/Alterations / Interior Alterations / Office: Proposal for interior alterations including new furniture layout, new finishes, and new partitions for meeting rooms. | $1.9M | Nov 3, 2026 |
| 11 | 80 Queen'S Park | 80 Queen'S Park, Toronto, ON | Mechanical(MS) / Other(MS) / University: Replace existing roof mounted exhaust fans (EF-2.1,29,30), Replace existing pumps, CP-5 and CP-6 found in mechanical room E045, Replace existing pump, CP-11 and CP-14 found in mechanical room 55, Replace existing pump, M-42 found in mechanical room 55, Replace the existing air handling units, AHU-311 and AHU-319 within 3rd floor mechanical rooms in 311 and 319. | $1.7M | Nov 4, 2026 |
| 12 | 1504 Dupont St | 1504 Dupont St, Toronto, ON | Building Additions/Alterations / Multiple Projects / Multiple Unit Building: Proposal for interior alterations to the existing basement and ground floor to accommodate a veterinary clinic, construction of a second-storey addition containing three residential dwelling units, and construction of a 2 storey side addition | $1.5M | Nov 3, 2026 |
| 13 | 50 Raleigh Ave | 50 Raleigh Ave, Toronto, ON | Building Additions/Alterations / Multiple Projects / Industrial: Proposed multiple projects including interior alterations, new roof and one-storey ground-floor addition. | $1.3M | Nov 5, 2026 |
| 14 | 155 University Ave | 155 University Ave, Toronto, ON | Building Additions/Alterations / Interior Alterations / Office: Interior alterations to an existing office - Unit 600 | $1.3M | Nov 5, 2026 |
| 15 | 5 Everson Dr | 5 Everson Dr, Toronto, ON | Fire/Security Upgrade / Fire Alarm / Apartment Building: Proposal for fire alarm panel replacement | $1.0M | Nov 3, 2026 |
| 16 | 300 Consilium Pl | 300 Consilium Pl, Toronto, ON | Building Additions/Alterations / Interior Alterations / Office: Proposal for interior alterations to floors 1 - 6. | $1.0M | Nov 5, 2026 |
| 17 | 17 Boothroyd Ave | 17 Boothroyd Ave, Toronto, ON | New Houses / New Building / 3+ Unit - Detached: Proposal to construct a new 3 storey detached dweling with 5 units.See also 23 202802 ZAP and 24 159201 TLAB<< Scope has changed to 5-plex>> M.I | $1.0M | Nov 4, 2026 |
| 18 | 205 Wynford Dr | 205 Wynford Dr, Toronto, ON | Plumbing(PS) / Other(PS) / Apartment Building: Proposal for domestic piping replacement. | $1.0M | Nov 5, 2026 |
| 19 | 4001-4005 Bayview Ave | 4001-4005 Bayview Ave, Toronto, ON | Building Additions/Alterations / Garage Repair/Reconstruction / Apartment Building: Garage repair / reconstruction -Structural work related to 26 189845 MSA 00 MS | $1.0M | Nov 2, 2026 |
| 20 | 66 Burnaby Blvd | 66 Burnaby Blvd, Toronto, ON | Small Residential Projects / Interior Alterations / 3+ Unit - Detached: Proposed interior alterations and new third storey addition to convert existing SFD to apartment building with 5 units | $800K | Nov 5, 2026 |
| 21 | 780 Pape Ave | 780 Pape Ave, Toronto, ON | Small Residential Projects / Multiple Projects / 3+ Unit - Detached: Proposal for rear addition and third-storey addition to convert a single-family dwelling into a six-unit dwelling, including interior renovations. | $500K | Nov 4, 2026 |
| 22 | 2 Mccowan Rd | 2 Mccowan Rd, Toronto, ON | Small Residential Projects / Interior Alterations / 3+ Unit - Detached: Converting the existing 2 storey single family detached house to a 3unit house, removing the unauthorized work done in the garage and converting it back to original one car garage and removing the unauthorized roof structure over the basement walkout stair. | $65K | Nov 4, 2026 |
Method
Every building permit with a declared valuation issued from the first of the month, from the city and county permit feeds Groundbreak reads daily, ranked by valuation. Trade sub-permits are excluded. The project link opens the file the permit was matched to.
Building permits with the estimated cost in Toronto, Mississauga, Oakville and Burlington, the units on many and the builder on a few. Rezonings and site plans in Toronto, Oakville and Brampton, Brampton's with the applicant. Schools and hospitals from Ontario Builds. Ontario land titles are not free, so sales, loans and owners are not tracked.
Questions
- What are the largest building permits filed in Toronto this month?
- 22 of the largest building permits issued in Toronto so far this month add up to $199M in declared valuation. The biggest, $100M, is 65 Raglan Ave at 65 Raglan Ave, Toronto, ON.
- How current is this page?
- It was computed at Nov 7, 2026, 2:17 PM Eastern from the filings Groundbreak had read by then, and it recomputes about once an hour. The permit and recorder feeds themselves lag the counter by a day or two.
- Where does the data come from?
- Building permits with the estimated cost in Toronto, Mississauga, Oakville and Burlington, the units on many and the builder on a few. Rezonings and site plans in Toronto, Oakville and Brampton, Brampton's with the applicant. Schools and hospitals from Ontario Builds. Ontario land titles are not free, so sales, loans and owners are not tracked. Every row on a project file links to the source document.
- Can I cite these numbers?
- Yes, with a link to https://pro.groundbreak.city/toronto/stats/largest-permits-this-month and the computed time. The method is stated on the page.